New sewer line installation to take place on Meadow Lane

Road_Construction_102

KINGSPORT – New sewer line installation will take place on Meadow Lane in Colonial Heights and will be down to one lane between White Oak Lane and Red Oak Lane. The alternate route will be Sir Echo Drive.  Motorists are asked to seek alternative routes while using the utmost caution in and around the work zone. The construction will occur December 7 – December 16 from 8:00 am – 5:30 pm.